Stockyard
HPSS Project

Project Overview

Located 10km from the town of Eneabba, proximal to the Brand Highway and 160km to the Geraldton port;

  • Substantial granted tenement package of 575km2;
  • Targeting high purity silica sand across predominantly cleared private land. No native title implications;
  • Indicated and Inferred Mineral Resource of 9.6 million tonnes at 98.9% SiO2
  • The resource is contained within 1500 Ha of the Stockyard Project and represents <5% of the total landholding
  • Advanced project with:
    • Mining Lease M70/1417 granted
    • Water Licence Granted and bore established
    • Completed Key Environmental Studies
    • Heritage Survey completed
  • Significant progress on Scoping Study and Pre-Feasibility Study
  • Two-stage non-binding MOU for supply and potential refining of HPSS with Shandong Hongbote Solar Technology Co (SHST)